icon

PW2000 Engine

Aviation Engine Overhaul Services for the PW2000

Our aircraft maintenance centers are committed to exceptional performance. By bringing together our global network, Non-destructive Testing (NDT), repair and warranty capabilities, we provide industry-leading services to your aircraft. And with our new aircraft engine lease and exchange program, now is the perfect time to take advantage of our proven services.

MRO Solutions for Your PW2000 Engine Fleet:

  • EXPERIENCE
  • As the largest commercial PW2000 fleet operator and MRO, we average 140 shop visits a year.
  • SPEED
  • We lead the industry with turnaround times as short as 25 days.
  • CONTINUITY
  • Exchange or short-term engines are available during your shop visits.
  • OPPORTUNITY
  • Immediate induction slots are available.
  • INVENTORY
  • We maintain a surplus of PW2000 (PW2037, PW2040, & PW2043) inventory for instant availability.
  • VERSATILITY
  • Both OEM and PMA/DER parts are available to fit your needs.
  • VALUE
  • Delta TechOps offers the most competitive pricing in the business – hands down.

PW2000 Aircraft Engine Overview:
The first Pratt & Whitney PW2000 commercial engine series is best known for powering the Boeing 757-200 and entered service with Delta Air Lines as the civil aviation launch customer for the new engine type. Today, PW2000s are in use in medium-to-long-haul commercial and military applications. The PW2000 engine also entered service in 1984 as the first commercial engine with Electronic Engine Control (EEC) technology.

Pratt & Whitney Commercial Engines - PW2000 Aircraft Engine Profile

  • Two-shaft-turbofan engine
  • Active clearance control
  • On-condition maintenance
  • Modular design
  • Digital control unit (EEC)
  • Low-pressure turbine
  • Turbine exhaust casing
  • HPC and HPT components
  • ETOPS (Extended-range Twin-engine Operations) approved

PW2000 Aircraft Engine Technical Specifications

Max. thrust 191 kN
Bypass ratio 6:1
Pressure ratio 32.1:1
Length 3729 mm
Fan Diameter 2150 mm
Weight 3311 kg



Delta TechOps Provides Engine Maintenance Services for the Following Pratt & Whitney PW2000 Commercial Engines

PW2037
PW2040
PW2043

Delta TechOps PW2000 Commercial Engine Service Capabilities

Delta TechOps PW2000 — MRO Service Experience

  • MRO services provided since 1984
  • PW2037, PW2040, PW2043 aircraft engine overhaul capabilities
  • Over 140 average annual aircraft engine overhaul shop visits
  • Typical overhaul turnaround time: 55 days and as little as 25 days. (individual TAT varies by workscope and terms)

Contact Us

PW2000 Engine
UPCOMING EVENTS

Sep
14

Aero-Engines Europe

Aero-Engines Europe offers a unique opportunity for all the players in the aero-engine manufacturing and maintenance industry to come together and discuss current trends and issues.

Read more

WHAT'S HAPPENING NOW
Delta TechOps
@DeltaTechOps
Jul 08
A rare @wired look inside our vault where we rebuild jet engines to keep you flying safely. https://t.co/FgLksdTfmN https://t.co/d0IuUSS253
Delta TechOps
@DeltaTechOps
Mar 25
Visit @deltatechops at #NSBE42 booth #1125 to learn more about engineering at one of the best airlines in the world #keepclimbing
Delta TechOps
@DeltaTechOps
Feb 09
Our VP of Sales will speak at @MRONetwork Aero-Engine Conference! Stay tuned for #AvMRO highlights. https://t.co/82FpyoyDRS
Delta TechOps
@DeltaTechOps
Feb 01
We draw on 30+ yrs of managing a leading fleet to deliver top landing gear #AvMRO services https://t.co/xbRsQwHz1e https://t.co/EaU5RQ7lY2
Delta TechOps
@DeltaTechOps
Jan 29
#DidYouKnow that we can get you flying faster, w/ landing gear MX turn times b/w 35-45 days? https://t.co/xbRsQwZ9SM https://t.co/nvZ04jKYdh
Delta TechOps
@DeltaTechOps
Jan 22
Our team is speaking today about Latin America partnerships and #AvMRO changes. #MROLA https://t.co/Pj0vUEEsxm https://t.co/IHLAquLpQR
Delta TechOps
@DeltaTechOps
Jan 21
Our team is excited to be in Peru today discussing #AvMRO at the @Avweekevents MRO Latin America conference! #MROLA https://t.co/eWfL40an9w
Delta TechOps
@DeltaTechOps
Jan 20
#DidYouKnow that it takes 400-1500 Nitrogen PSI for in-service landing gear? https://t.co/xbRsQwHz1e #AvGeek https://t.co/L0DntdOhns
Delta TechOps
@DeltaTechOps
Jan 11
#DidYouKnow that our Line #Maintenance offers 200K+ overnight checks per year? https://t.co/iQumTUmgNv #AvMRO https://t.co/LoOTjP1uNP
Delta TechOps
@DeltaTechOps
Dec 30
Our advanced aircraft + a Porsche + 35 cameras = one epic video. Watch now: https://t.co/dgwpaUIF2O https://t.co/NsuNrSUulb